JobBOSS vs PlanetTogether vs Asprova vs Skody

    These four products overlap in production scheduling, but they are not four versions of the same product. JobBOSS² is fundamentally an ERP for job shops, PlanetTogether and Asprova are established APS platforms, and Skody is primarily a production scheduling and decision layer designed to work with an existing ERP. The choice is therefore architectural: decide what layer you are missing before comparing features.

    Written by Alex Lebedev, Co-Founder, Skody AI · Last reviewed: September 2026

    Full comparison matrix

    Values are categorical: Yes, Partial, Verify with vendor or Not primary focus. There are no scores. "Verify with vendor" means current public documentation did not confirm the capability either way.

    JobBOSS² vs PlanetTogether vs Asprova vs Skody, September 2026
    AttributeJobBOSS²PlanetTogetherAsprovaSkody AI
    Primary product categoryJob-shop ERPAPS platformAPS platformProduction scheduling / decision layer
    Best fitShops needing shop-management ERPPlanner-owned APS over an ERPDetailed sequencing at scaleHigh-mix shops keeping their ERP
    ERP includedYesNot primary focusNot primary focusNot primary focus
    Designed to complement ERPNot primary focusYesYesYes
    Finite capacityPartial — verify depth with vendorYesYesYes
    Machine constraintsPartial — verify with vendorYesYesYes
    Labour capacityVerify with vendorVerify with vendorVerify with vendorYes
    Operator skillsVerify with vendorVerify with vendorVerify with vendorYes
    Material constraintsYes — via MRP/inventoryYesYesYes
    Setup sequencingVerify with vendorYesYesYes — setup families and clustering
    Outside processingYes — as purchased service; verify scheduling treatmentVerify with vendorVerify with vendorYes
    Dynamic reschedulingNot primary focusPlanner-triggered; verify event triggersFast re-sequencing; verify event triggersPrimary focus — recomputes from current ERP and floor state
    Multi-pallet / lights-out manufacturingVerify with vendorVerify with vendorVerify with vendorYes
    VisualisationERP dashboards and job viewsGantt and planning viewsGantt and sequencing viewsGantt, worker schedule, bottleneck map, late-job and capacity views
    Enterprise planning depthNot primary focusYesYesPartial — focused on the shop, not network planning
    Implementation complexityLow to moderate — but it is an ERP changeModerate to highHighLow to moderate
    High-mix suitabilitySuitable as an ERPStrongStrongPrimary focus

    Compiled from public vendor documentation, September 2026. No vendor paid for placement. Verify critical requirements directly.

    Choose JobBOSS² if…

    …the gap is the system of record. JobBOSS² is a shop-management ERP built for job shops, covering estimating and quoting, job management, purchasing, inventory and the accounting ecosystem around them, with scheduling included. If quoting lives in spreadsheets, job costs are reconstructed after the fact, or the current ERP is being replaced anyway, buying a scheduling layer first solves a symptom. Verify the current feature set and scheduling depth with ECI before purchase.

    Choose PlanetTogether if…

    …you want an established APS engine layered on an ERP, owned by a production planner who wants direct control of scenarios and optimisation rules. It is a common choice in mid-market and larger plants running a mix of repetitive and make-to-order work, and it has a mature partner and integration ecosystem. Verify connector coverage for your ERP and how rescheduling is triggered.

    Choose Asprova if…

    …the scheduling problem is detailed and large: many operations, sequence-dependent setups, and a requirement for a deeply configured model. Asprova has a long track record in detailed production scheduling and suits organisations with the internal or partner expertise to build and maintain the configuration. Verify current deployment options and labour-modelling depth.

    Choose Skody if…

    …the existing ERP is staying, but the manufacturer wants a schedule that continuously adapts to machine, labour, material and priority changes. Skody reads current production information from the ERP and recomputes the finite-capacity schedule against machines, operators and skills, shifts and calendars, material readiness, outside processing, setups, pallets and unattended running, and today's priorities. It is not an ERP and does not attempt enterprise network planning.

    The architectural difference

    ERP: orders → routings → inventory → transactions

    APS: ERP data → constrained optimisation → production plan

    Decision layer: ERP / current state → finite-capacity schedule → actual changes → recompute → updated decisions

    This is a simplification. Real products blur the boundaries: some ERPs include finite-capacity scheduling, and some APS platforms support frequent re-optimisation. The diagram is useful for deciding which layer you are missing, not for judging any individual product.

    Example: a Tuesday morning disruption

    Consider a hypothetical job shop: 50 work centres, 20 operators with different skill qualifications, 300 active jobs. On Tuesday morning a customer expedites an urgent order, machine #17 goes down, and two operations run long.

    What to ask each vendor about this scenario

    Rather than assuming how each product behaves, put the scenario in front of the vendor and ask: what changes on the screen, who has to act, and how long does it take?

    • Does the system recalculate the remaining sequence, or does it show the original plan with the disruption noted?
    • Are the operators qualified for the displaced work identified automatically, or does the planner check a skills matrix by hand?
    • When machine #17 is marked down, does downstream capacity and every affected due date update?
    • Does inserting the expedite show which existing promises are now at risk, before the decision is committed?
    • How long does a full recalculation take at 300 active jobs across 50 work centres?
    • Who performs the recalculation — a planner running a job, or the system on an event?

    We deliberately do not state how JobBOSS², PlanetTogether or Asprova respond to this scenario. Their behaviour depends on configuration and version, and asserting it without verification would be exactly the sort of claim this page exists to avoid.

    Which one should I choose?

    Buyer profileWhere to start
    Existing ERP is staying, and schedule volatility is the problemInvestigate Skody — a decision layer over the ERP
    Need a new job-shop ERP: quoting, jobs, purchasing, costingInvestigate JobBOSS²
    Want an established traditional APS owned by a plannerInvestigate PlanetTogether and Asprova together
    Standardising planning across multiple plantsInvestigate enterprise APS/MOM suites such as Siemens Opcenter APS

    The distinction matters more than any feature list. An ERP purchase replaces your record of truth and touches every department. An APS purchase adds a planning engine and a planner's workflow. A decision layer leaves both in place and changes how often the schedule is right. Buying the wrong layer produces an expensive project that does not fix the complaint.

    Frequently asked questions

    Is Skody an ERP?

    No. Skody is a production scheduling and decision layer that connects to an existing ERP. It does not provide order entry, purchasing, inventory, MRP or accounting; it reads production information from the ERP and computes a finite-capacity schedule against current shop conditions.

    Is JobBOSS an APS system?

    JobBOSS² is fundamentally an ERP for job shops — quoting, jobs, purchasing, inventory and costing — with scheduling included as part of the system. Buyers should evaluate its scheduling depth on their own routings rather than assuming parity with a dedicated APS engine.

    What is the difference between Asprova and PlanetTogether?

    Both are established APS platforms that layer finite-capacity scheduling over an ERP. They differ in configuration style, deployment model and ecosystem rather than in category. Compare them on labour modelling, sequence-dependent setups, recalculation speed at your operation count and connector coverage for your ERP.

    Which is best for high-mix manufacturing?

    For high-mix, low-volume work all four can be shortlisted, but for different reasons: JobBOSS² if the ERP itself is the gap, Asprova or PlanetTogether if you want a planner-owned APS engine, and Skody if the ERP stays and the problem is that the schedule stops matching the floor during the day.

    Which works with an existing ERP?

    PlanetTogether, Asprova and Skody are all designed to work alongside an ERP rather than replace it. JobBOSS² is the ERP, so it is the alternative to your current system of record rather than a layer on top of it.

    Which can account for labour constraints?

    Skody schedules operator availability and skills as constraints alongside machines. For PlanetTogether, Asprova and JobBOSS², verify labour and skills modelling directly with the vendor — several systems represent labour as a shift calendar rather than as named skills.

    Do I need APS if my ERP already has scheduling?

    Not necessarily. If the ERP scheduler produces a plan operators actually follow, you do not have a scheduling software problem. Dedicated scheduling earns its place when routings vary, resources are shared, labour skills constrain capacity, and the plan is invalid within hours.

    Can any scheduler automatically recover from disruptions?

    No system removes the disruption. What a scheduler can do is recompute a feasible sequence quickly enough that the planner decides with current information instead of guessing. Ask each vendor what triggers a recalculation, how long it takes and which constraints are included.

    Sources and verification

    Statements on this page are drawn from each vendor's own public product information. Where documentation did not confirm a capability, the page says "verify with vendor" rather than guessing. Product functionality changes; confirm anything critical directly with the vendor.

    • JobBOSS² (ECI Software Solutions)Product category as a job-shop ERP with scheduling included. Checked 6 September 2026.
    • PlanetTogetherProduct category, APS positioning and ERP-integration approach. Checked 6 September 2026.
    • AsprovaProduct category, finite-capacity scheduling scope and deployment model. Checked 6 September 2026.
    • Siemens Opcenter APSEnterprise APS positioning and planning/scheduling scope. Checked 6 September 2026.
    • Skody AISkody's own product scope, constraints modelled and ERP-integration approach. Checked 6 September 2026.

    Editorial methodology

    • Products were selected for their relevance to discrete production scheduling, not for commercial relationships.
    • Comparisons use publicly available vendor documentation and product information current as of September 2026.
    • Skody AI is included because Skody publishes this page. We say so plainly rather than presenting the comparison as third-party research.
    • No vendor paid for placement, ranking or inclusion. There are no editorial scores and no reviews on this page.
    • Product functionality changes. Buyers should verify every critical requirement directly with each vendor before purchase.

    Last reviewed: September 2026