Skody
    Book a Private Demo
    FABTECH 2026 · Oct 21–23 · Las Vegas · Booth C4546

    Google Maps for Manufacturing

    Your production schedule is probably wrong before lunch.

    Skody recalculates what should run next based on what is actually happening in the shop — machines, labor, materials, outside processing and due dates.

    Built for high-mix manufacturing, CNC, fabrication and complex job shops.

    See Skody reroute an entire shop in under a minute.

    skody.ai · live schedule
    STREAMING
    Skody production schedule recomputed from the live state of the shop

    Real Skody schedule · recomputed on demand or on ERP change

    The schedule is already wrong.

    You had a plan at 6 AM. Then a machine went down. Material didn't arrive. A hot job showed up. An operator called out. A vendor pushed heat treat three days. Most ERP and APS schedules still show the plan you had. Skody recomputes the shop from where production actually is now.

    Planned Route
    Traffic Jam
    New Route Proposed
    ERP Plan · 06:00
    • ·Jobs sequenced
    • ·Machines assigned
    • ·Promises set
    Reality · 10:42
    • ·Machine down
    • ·Rush order in
    • ·Material delayed
    Skody · 10:43
    • ·Schedule recomputed
    • ·Constraints resolved
    • ·New path proposed

    Like Google Maps rerouting around traffic — except the traffic is your factory. The planner reviews the proposed plan and decides what gets committed.

    Visibility that helps you act, not just observe

    Skody AI dashboards connect the schedule to the real constraints behind it — bottlenecks, material readiness, and worker load.

    Skody AI bottleneck view
    Bottleneck by weekWaiting vs runningDelivery impact

    Bottleneck analysis

    See the constrained work center, the jobs stacked behind it, and the due-date impact in one operational view.

    Skody AI materials view
    ERP + material statusArrival visibilityReady vs blocked

    Material readiness

    See whether work is actually ready to run — with material status, arrivals, and blockers surfaced before they hit the floor.

    Skody AI worker utilization
    Worker hoursLoad by personFuture labor pressure

    Labor + capacity visibility

    See who is overloaded, who has available capacity, and how upcoming work is distributed across the team.

    Built for the fab shop

    Scheduling gets harder when fabrication gets real.

    Laser + machine capacity

    Schedule finite capacity across machines and work centers.

    Labor + skills

    Know whether the machine is available and whether the right person is available to run it.

    Outside processing

    Heat treat, paint, powder coat, plating and other outside operations stay inside the production plan.

    Assembly dependencies

    Coordinate multi-step jobs and components so downstream assembly is scheduled against reality.

    Material readiness

    Stop scheduling work against material that isn't actually available.

    Live at FABTECH 2026

    See your shop change. Then watch Skody reroute it.

    FABTECH 2026 · Booth C4546

    Las Vegas Convention Center · Central Hall · Las Vegas, NV

    At FABTECH Booth C4546 we're demonstrating how Skody handles real production changes without planners manually rebuilding the schedule.

    • Real-time finite capacity scheduling
    • Automatic scheduling conflict resolution
    • Due-date optimization
    • Bottleneck prediction
    • Labor and skill constraints
    • Material availability
    • Outside processing
    • Pallet and lights-out scheduling
    • What-if scheduling before committing the plan
    • ERP-connected production visibility

    The narrative

    Production scheduling is changing.

    Era 1
    1980s →

    Excel + tribal knowledge

    Planners hand-sequenced jobs. The schedule lived in someone's head — and on a whiteboard.

    Era 2
    2000s →

    APS + finite capacity optimization

    Better planning. But still a static snapshot — re-run nightly, obsolete by 9 AM.

    Skody is built for Era 3
    Era 3
    Now

    Recompute-on-change scheduling

    The plan is recomputed from live production conditions when you ask or when something significant changes, and the planner commits it.

    Most scheduling systems tell you where the plan was.
    Skody helps manufacturers navigate from where production actually is.

    Running daily
    in production shops
    0% churn
    since GA
    <30 days
    to first live schedule
    "We were stuck under 80% OTD. With Skody, we're now planning toward 100% — not a static schedule, a worker-driven plan our team actually follows."
    Zachary Yeager · President, Aerospace & Defense Job Shop

    Trusted by precision manufacturers across the United States

    Three Sigma Manufacturing
    Yeager Manufacturing
    Coastal Manufacturing
    Zimmer
    LOC
    CU Vector
    Lafarge + Egge
    Gurecky Manufacturing Service
    GMS Metal Works
    Integral Fabrication & Engineering
    MetroFab
    Three Sigma Manufacturing
    Yeager Manufacturing
    Coastal Manufacturing
    Zimmer
    LOC
    CU Vector
    Lafarge + Egge
    Gurecky Manufacturing Service
    GMS Metal Works
    Integral Fabrication & Engineering
    MetroFab
    Built with manufacturers, not for them

    Built with real manufacturers.

    Iterated daily on actual shop floors. Created by ex-Microsoft engineering leaders and manufacturing operators who got tired of watching schedules go stale by lunch.

    See Skody live at FABTECH 2026

    October 21–23, 2026
    Las Vegas Convention Center
    Booth C4546

    Frequently asked questions

    Where is Skody at FABTECH 2026?

    Skody is at FABTECH 2026 in Booth C4546 — Las Vegas Convention Center, Central Hall, Las Vegas, NV, October 21–23, 2026.

    What does Skody actually do at a fabrication shop?

    Skody recomputes the production schedule from the live state of the shop — machines, labor and skills, material readiness, outside processing and due dates — and proposes an updated plan. It resolves scheduling conflicts automatically and optimizes around due dates; the planner reviews and stays in control of what gets committed.

    Does Skody change the sequence on the floor by itself?

    No. Skody produces a proposed updated plan. The planner reviews the proposal, adjusts if needed, and commits it. Skody does not change the production sequence without a person.

    How does Skody handle outside processing like heat treat or powder coat?

    Outside operations are modeled as steps in the routing with their own lead times and promised return dates, so a vendor pushing heat treat three days shows up as a due-date risk on the downstream operations instead of a surprise at assembly.

    Does Skody replace our ERP?

    No. The ERP stays the system of record. Skody connects to it (read-only) and adds finite capacity scheduling and live shop conditions on top.

    What kind of shops is Skody built for?

    Discrete manufacturers running roughly 20–200 machines: fabrication, CNC machining, precision job shops, aerospace and defense suppliers, and other high-mix environments where the schedule changes hourly.

    Stress-test your current schedule

    See your shop rerouted against real conditions. We'll walk through how Skody resolves scheduling conflicts and proposes an updated plan — using a workflow relevant to your shop.

    No credit card required • 15-minute setup call